Sanlian The Model List of dredging vessels
一、Dredger |
Type
category
|
WS-1 |
WS-2 |
WS-3 |
WS-4 |
WS-5 |
TWS-1
(the boat) with attached |
TWS-2
(the boat) with attached |
floating |
long
(m) |
A |
13m |
14m |
15m |
16m |
17m |
20m |
22m |
B |
14m |
14.5 |
15.5m |
17m |
18m |
20m |
22m |
C |
15.5m |
16m |
16.5m |
18m |
20m |
20m |
22m |
wide
(m) |
A |
1.5m |
1.5m |
1.5m |
1.5m |
1.7m |
1.8m |
1.8m |
B |
1.5m |
1.5m |
1.5m |
1.5m |
1.7m |
1.8m |
1.8m |
C |
1.7m |
1.7m |
1.7m |
1.7m |
1.8m |
1.8m |
1.8m |
Form of transportation
(mixing except) |
A |
Two
transmit |
Two
transmit |
Two
transmit |
Two
transmit |
Two
transmit |
Two
transmit |
Two
transmit |
B |
Three
trans-mission |
Three
trans-
mission |
Three
tran-smission |
Three
tran-smission |
Three
tran-smission |
Three
tran-smission |
Three
tran-smission |
C |
Four
tran-smitting |
Four
tran-
smitting |
Four
tran-smitting |
Four
tran-smitting |
Four
tran-smitting |
Four
tran-smitting |
Four
tran-smitting |
Conveying arm length
(Clean sand/
small stone /full) |
A |
12m/6m |
13m/6m |
14m/8m |
15m/10m |
18m/12m |
12m/6m |
12m/6m |
B |
13m/9/8 |
13.5m/
9.5m/6m |
15m/
11m/6m |
16m/
12.5m/8m |
18m/
14m/12m |
14m/
10m/8m |
14m/
10m/6m |
C |
15m/12m
/8m/6m |
15.5m/12.5m
/ 9m/6m |
15.5m/12m
/8m/6m |
17m/13m/
10m/10m |
20m/17m
/14m/15m |
15m/
10m/6m |
16m/12m
/9m/5m |
Gearbox
configuration |
A |
quantity |
2sets |
2sets |
2sets |
3sets |
5sets |
5sets |
5sets |
Type |
16 06 |
16 06 |
16 06 |
16 06 |
30 16 06 |
30 16 06 |
30 16 06 |
B |
quantity |
3sets |
3sets |
3sets |
3sets |
5sets |
5sets |
5sets |
Type |
32 16 06 |
32 16 06 |
32 16 06 |
32 16 06 |
30 16 06 |
30 16 06 |
30 16 06 |
C |
quantity |
3sets |
3sets |
3sets |
3sets |
5sets |
5sets |
5sets |
Type |
32 16 06 |
32 16 06 |
32 16 06 |
32 16 06 |
30 16 06 |
30 16 06 |
30 16 06 |
Reducer configuration
(Horizontal reducer) |
A |
quantity |
4sets |
4sets |
4sets |
5sets |
9sets |
9sets |
9sets |
Type |
500、350、250 |
500、350、
250 |
500、350、250 |
500、350、250 |
650、350、250 |
650、350、250 |
650、350、250 |
B |
quantity |
4sets |
4sets |
4sets |
6sets |
9sets |
9sets |
9sets |
Type |
500、350、250 |
500、350、
250 |
500、350、250 |
650、350、250 |
650、350、250 |
650、350、250 |
650、350、250 |
C |
quantity |
5sets |
5sets |
5sets |
6sets |
9sets |
9sets |
9sets |
Type |
500、350、350 |
500、350、
350 |
500、350、350 |
650、350、250 |
650、350、250 |
650、350、250 |
650、350、250 |
Hopper (a) |
42-46 |
48-52 |
52-58 |
60-66 |
66-78 |
60-70 |
70-76 |
Under the
digging depth(m) |
4m-4.8m |
4m-6m |
4m-7.5m |
4m-10m |
4m-12m |
8m-12.5m |
8m-14m |
Dealing with
wool / h |
60-100m3 |
60-80m3 |
60-80m3 |
60-80m3 |
60-80m3 |
50-70m3 |
50-70m3 |
Equipped with
power |
1105-1100 |
1110-1100 |
1115-1100 |
1110-1100 |
1115-1100 |
2100-1100 |
2100-1100 |
Chain plate
Pitch(cm) |
60cm |
60cm |
60cm |
60cm |
60cm |
70cm |
70cm |
|
Note: Due to layout constraints, not entirely with us in telephone counseling. The above data for reference purposes only, specific issues should be based on geographical conditions and people that needs the system to do. Change due to product updates without notice. |
二、Screen Sand Machine |
Type
category |
Chassis Size |
Transmission rod length
(m) |
Processing wool
/小時(shí) |
Net Stone Type |
Equipped with power |
Two transmit |
6.7m/0.6m/0.35m |
8m/m |
80-150m3 |
1/4Stone |
1105-1100 |
Three transmission |
8.3m/0.6m/0.35m |
12m/7m/8m |
80-200m3 |
2-3cm/3-5cm |
1110-1100 |
Four transmitting |
10.5m/0.8m/0.35m |
13m/9m/6m/8m |
80-150m3 |
1-2cm/2-4cm/3-6cm |
1110-1100 |
Gravel Screening Machine |
10.5m/0.8m/0.35m |
10m/7m/6m |
80-12m3 |
1-2cm/3-5cm |
Hammer Mill
1115-1110 |
|
三、Pumping sand |
Type |
Captain、wide、Size |
Hull Capacity |
Depth of gravel extraction |
Large |
long12mwide3.5m |
13m3 |
13-15m |
Small |
long15mwide5m |
30m3 |
13-15m |
|
Note: Due to layout constraints, not entirely with us in telephone counseling. The above data for reference purposes only, specific issues should be based on geographical conditions and people that needs the system to do. Change due to product updates without notice. |
◆Specifications
Dredging vessel capable of handling wool 80 cubic meters per hour or so, the net sand sandy good or bad according to 30-80 cubic meters per hour, underwater digging depth: large-scale dredging vessel 13 meters, the general dredgers 4 - 8 meters, with There Changchai 1100,1110, fuel consumption 2.5kg / hour, the staff 2. Including the wages of the workers every day only 100 yuan. This product has a separate screening as a single, double two, sand stones, mud, weeds, etc. and the sand can be separated, through the conveyor belt be sent. Transport part of the divided into two pairs of transmission-type, single-delivery type two kinds. Sand and impurities can be separated on both sides. Transmission distance of 10-20 meters of sand and impurities transport distance of 6-16 meters. The dredging machine broadly divided into the hull, main frame, power, deceleration system, part of the underwater excavation, transport driving part, the operation part. Boat total wide4.5-5 Mi, long10-20 meters, 5 meters high, sand-height of 2-8 meters. Pumping sand: an hour can be extracted from a depth of 13 meters underwater, filter sand 60 cubic meters / hour, the whole cabin is divided into three bodies, two for the floating-body, in the middle for the sand tank. Capacity: large-scale pumping sand to 30 cubic meters of sand is usually pumped 13 cubic meters. Walking speed of 15km / hour, diesel engine driven pulp machine hang. Sieve sand machine: dry sand handling 100 cubic meters of water / hour, sub-transmission type II-VI, and San conveyor type.
◆ Operation Operation and Maintenance
This machinery after repeated practice and improvement, high degree of automation, easy to learn a good operation, only two people in each class operation, concrete steps are as follows:
1, boot before transmission to the entire machinery and machine oil check, and then starting the engine behind the conveyor belt pull, pull the clutch to launch diesel engine, and slowly moving loose clutch will be transferred to a normal speed. Re-launch before the zipper of the buckets of diesel engines. 2, two diesel engine after starting. Will be transferred to the need for speed speed. Then release the brake arm. Gradually, its down, and so on within the sand hopper more than 2 / 3, to stop decentralization, to wait until 1 / 3 funded by the arm again. When the big arm and the surface of the water when the 45-degree angle (ie, 5 meters or so), shall be parked big arm. At this time the amount of sand inside the hopper to use traction control, move forward to see the amount of sand inside the bucket, depending on progress back to be flexible in case of mechanical sand cave-strenuous work, or pull them in when traction Shengsong open, so that vessels to move backward, move up until the digging. Under the case of large stones such as water or mud layer, the hull will be intense vibration phenomenon, this time should be immediately brought dredging arm, avoid obstacles further.
3, work should pay attention to the following points:
The new machinery or overhauled to be run-in after 24 hours before normal operation.
(1) According to the geographical conditions of backward and forward arm raise, action should be flexible, within the hopper, if large stones, mud, etc. must be clean.
(2) should always check the chain screw, pin, and transmission of various fixed-point fasteners must firmly.
4, stopping inside the hopper so that the sand should be less than 1 / 2, the arm slowly raised, until the exposed surface of underwater corners round. No sand inside the hopper, and then before the engine shut down, and then after the engine stopped. 5, the event of strong winds (5 and above) should be temporarily shut down, so as to avoid failure, repair or replacement of parts should be shut down work in order to avoid human casualties.
6, maintenance and maintenance: Using the period should always check the various parts of the screw and often filling lubricant and maintenance, especially the hopper and screw pin chain, the water wheel and 500 square butt plate reducer Ministries certain fastening bolts intact. Underwater square wheels, with a place should always add the word butter, lubricating oil, flood, or stopped, the ship should be tied to a solid place to prevent the boat away or causing undue damage.
In order to ensure personal safety, we must note the following points:
1, under the age of 18 years and over 50 years of age shall not operate or repair this machine.
2, is strictly prohibited without the professional training or drink and operate machinery in this series.
3, dredging machine repair, they must be all the mechanical headway ran before they are allowed. |
|
|
|
 |
 |
 |
 |
|